Standard design or engineered design
Not every sidewalk shed needs a new engineered design. The Board of Standards and Appeals maintains an approved standard design for sheds that can be referenced on submitted drawings, which changes what has to be sealed and by whom.
What the standard design is
The approved standard design of scaffold, BSA calendar number 362-44.SM, is a pre-approved design that a contractor may reference on the submitted drawings in place of a registered design professional's seal and stamp. It exists because a large share of sheds are conventional in form and repeat the same geometry.
Referencing it does not remove the drawing obligation. The set still has to be site specific and show the actual obstructions, dimensions and configuration.
When you need an engineered design
- Site geometry outside the standard, such as unusual frontage, heavy obstruction density, or curved facades
- Loads beyond the standard, including storage on the deck
- Supported scaffold bearing on the shed, which needs a loads imposed letter regardless
- Cantilevered or non-post-supported overhead protection
- Any configuration where the standard design simply does not describe what is going up
Cost and time difference
Standard design filings are faster and cheaper because there is no engineering fee attached to the seal. Engineered filings take longer and cost more, but there are jobs where the standard design will not carry the condition and attempting it just produces objections.
Key facts
- Standard design
- BSA 362-44.SM
- Effect
- May be referenced in lieu of RDP seal
- Still required
- Site-specific drawings
- Scaffold on shed
- Engineered route plus loads letter
Common questions
Is the standard design cheaper?
Usually yes, because there is no separate engineering seal fee. The drafting and filing work is comparable.
Can a standard design shed carry a scaffold above it?
Not without a loads imposed letter from a registered design professional, and often not at all depending on the configuration.