Post-approval amendments
A post-approval amendment changes an approved filing. On shed and scaffold work the usual triggers are a change in extent, a change in configuration, or a change of party after the filing was approved.
Common triggers
- The shed gets longer, shorter, or wraps a corner it did not previously cover
- The duty rating changes, for example because material will now be stored on the deck
- A supported scaffold is added above an existing shed
- Site conditions found in the field differ from what was drawn
- A party on the filing changes
PAA, renewal, or new filing
A renewal extends the permit on an unchanged filing. A post-approval amendment changes an approved filing that remains live. A new filing is what you need when the previous permit has lapsed entirely, or when the work is genuinely a different job.
Choosing wrong costs time. Filing a PAA against a lapsed permit does not revive it.
Doing it before the field changes
Where a field condition forces a change, the amendment should follow immediately rather than at the end of the job. A shed standing in a configuration that does not match its approved drawings is a finding waiting to happen.
Key facts
- Applies to
- Approved, live filings
- Renewal
- Extends an unchanged permit
- New filing
- Required after a lapse
Common questions
Does a PAA need new drawings?
Usually yes, at least for the affected portion, since the amendment has to show what changed.
Can I extend a shed without amending?
No. The approved extent is part of the filing. Extending beyond it without an amendment leaves the additional length unpermitted.